RIVERSIDE PARK
CITY PARk

EXPERT PROCEDURE
ACCORDING TO GUIDELINES FOR
PLANNING COMPETITIONS RPW 2013

Today, the riverside park is once again recognisable as an independent public open space. The new path and organisation structure of the riverside park picks up on the landscape qualities of the peninsula. In consideration of the location, the size of the area and the trees and shrubs, the park area was structured by a few recurring elements.

As a landscape element, the bank edge offers a special quality of experience towards the Spree and the Spree Canal. The most important element is a riverbank strip that accompanies the banks of the Spree. It is directly connected to the neighbouring city edge via short stretches of path. The orientation of the paths takes into account the different views and urban landmarks along the bank.

The riverwalk links the Inselstraße bridge with the Mühlendamm bridge without barriers. It consists of a stone edge and a soft paved surface. The stone edge traces the banks of the Spree and makes the border to the water tangible. As an element that is not only a pathway but also a place to spend time, it invites people to linger and observe. On the city side, a path surface made of water-bound surfacing is installed.

The Inselstraße bridge with a view of the ships in the historic harbour will be strengthened as a point of attraction for passers-by and tourists. The embankment of the Fischerinsel to the north-east complements these recreational opportunities and adds an attraction to the island. The embankment opens up to the south towards the fork of the Spree. A ramp provides barrier-free access to the bank, the historic towpath and the jetty.

ProjectBerlin Fisher Island
ClientDistrict Office Mitte of Berlin
Cooperationplanning with: IG Prof. Dr. Sieker mbH, Kusche & Partner Baumdienst GmbH, Zech-Con Beratene Ingenieure GmbH
construction management: Stoellger Liehr Partnerschaft, Jürgen Liehr, Thomas Föhre
Team ProjectUlrike Böhm, Cyrus Zahiri, Katja Benfer, Anna Vogels, Kerstin Paul, Thomas Reimann, Milan von Moeller
Area1 ha
Budget1,75 Mio EUR netto
Planning2020-2023
Realization2022-2023
PhasesLph 2-8
PhotographsAnton Fischer Fotografie,
Studio Hanns Joosten